Novarly ParcelRenewable sites

Renewable sitesSix Hills Solar Farm

Six Hills Solar Farm

Six Hills Solar Farm is operational in Melton with a recorded capacity of 18.7 MW, and has been generating since 2015-03-24.

18.7 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-03-24
Solar Photovoltaics
Technology
Lightsource Renewable Energy
Melton
Authority
England

Planning and build timeline

Application submitted2014-06-27
Permission granted2014-10-16
4 months after submission
Operational2015-03-24
5 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Melton’s record on solar

Melton has decided 12 solar farms and approved 100%, taking a median of 3.2 months. See every solar farm decision in Melton

Other built sites within 15 km

SiteMWDistance
Dalby
Wind Onshore · Operational
7.22.9 km
GDL Wymeswold Solar Farm/land off the A6006
Solar Photovoltaics · Operational
6.15.2 km
Land to the west of Ashfordby Business Park
Solar Photovoltaics · Operational
3.56 km
Land to the East of Burton Lane
Solar Photovoltaics · Operational
2.66.3 km
Wymeswold Airfield
Solar Photovoltaics · Operational
346.3 km
The Sawmill
Biomass (dedicated) · Operational
6.86.7 km
Asfordby Business Park (1)
Battery · Operational
23.46.9 km
Gypsom Solar Farm
Solar Photovoltaics · Operational
57.6 km

How big is Six Hills Solar Farm?

Six Hills Solar Farm has a recorded installed capacity of 18.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Six Hills Solar Farm?

REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Six Hills Solar Farm approved and built?

The application was submitted on 2014-06-27. Permission was granted on 2014-10-16, 4 months later. The site became operational on 2015-03-24, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2057.