Renewable sites › Pepsico International Limited, Leycroft Road - Solar Panels
Pepsico International Limited, Leycroft Road - Solar Panels
Pepsico International Limited, Leycroft Road - Solar Panels is under construction in Leicester with a recorded capacity of 3.25 MW.
Planning and build timeline
| Application submitted | 2024-01-11 |
| Permission granted | 2024-03-06 2 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Leicester’s record on solar
Leicester has decided 13 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Leicester →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Hoods Close - Solar Panels Solar Photovoltaics · Under Construction | 1.7 | 0.9 km |
National Space Centre Solar Photovoltaics · Operational | 0.2 | 2.4 km |
Severn Trent STW Wind Onshore · Operational | 2.5 | 4.2 km |
Newarke St Car Park - Solar Panels Solar Photovoltaics · Under Construction | — | 4.5 km |
Kirby Road Solar Panels Solar Photovoltaics · Under Construction | 0.49 | 4.7 km |
Bradgate Quarry Landfill Gas Scheme Landfill Gas · Operational | 2.5 | 5.8 km |
Apac Packaging, Loughborough Road - Solar Panels Solar Photovoltaics · Under Construction | 0.9 | 6 km |
Syston Road - Solar Farm Solar Photovoltaics · Under Construction | 26 | 6.2 km |
How big is Pepsico International Limited, Leycroft Road - Solar Panels?
Pepsico International Limited, Leycroft Road - Solar Panels has a recorded installed capacity of 3.25 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Pepsico International Limited, Leycroft Road - Solar Panels?
REPD records the operator as Walkers Snacks (Distribution) Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Pepsico International Limited, Leycroft Road - Solar Panels approved and built?
The application was submitted on 2024-01-11. Permission was granted on 2024-03-06, 2 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 15743.