Renewable sitesApac Packaging, Loughborough Road - Solar Panels

Apac Packaging, Loughborough Road - Solar Panels

Apac Packaging, Loughborough Road - Solar Panels is under construction in Charnwood with a recorded capacity of 0.9 MW.

0.9 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
APAC Group Limited
Charnwood
Authority
England

Planning and build timeline

Application submitted2022-08-09
Permission grantednot recorded
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Charnwood’s record on solar

Charnwood has decided 18 solar farms and approved 94%, taking a median of 5.5 months. See every solar farm decision in Charnwood

Other built sites within 15 km

SiteMWDistance
Mountsorrel Landfill Site
Landfill Gas · Operational
1.62.1 km
Gypsom Solar Farm
Solar Photovoltaics · Operational
52.3 km
Syston Road - Solar Farm
Solar Photovoltaics · Under Construction
262.5 km
Severn Trent STW
Wind Onshore · Operational
2.52.6 km
Hoods Close - Solar Panels
Solar Photovoltaics · Under Construction
1.75.5 km
Pepsico International Limited, Leycroft Road - Solar Panels
Solar Photovoltaics · Under Construction
3.256 km
National Space Centre
Solar Photovoltaics · Operational
0.27.4 km
Land to the East of Burton Lane
Solar Photovoltaics · Operational
2.69.3 km

How big is Apac Packaging, Loughborough Road - Solar Panels?

Apac Packaging, Loughborough Road - Solar Panels has a recorded installed capacity of 0.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Apac Packaging, Loughborough Road - Solar Panels?

REPD records the operator as APAC Group Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Apac Packaging, Loughborough Road - Solar Panels approved and built?

The application was submitted on 2022-08-09. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11975.