Sustainable Power and Research Campus
Sustainable Power and Research Campus is an operational 6.5 MW biomass plant in Fife, generating since 7 December 2016. Planning permission was granted on 10 February 2014, 1 months after submission. Operator of record: University of St Andrews.
Planning and build timeline
| Application submitted | 21 January 2014 |
| Permission granted | 10 February 2014 1 months after submission |
| Operational | 7 December 2016 34 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Fife: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Sustainable Power and Research Campus’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 1 | 0.1 km |
Solar Photovoltaics · Operational | 4 | 7.2 km |
Solar Photovoltaics · Operational | 0.62 | 7.8 km |
Battery · Under Construction | 49.9 | 11.1 km |
Solar Photovoltaics · Under Construction | — | 12.5 km |
Wind Onshore · Operational | 4 | 13.2 km |
EfW Incineration · Under Construction | 10 | 13.4 km |
EfW Incineration · Operational | 8.3 | 13.6 km |
How big is Sustainable Power and Research Campus?
Sustainable Power and Research Campus has a recorded installed capacity of 6.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Sustainable Power and Research Campus?
REPD records the operator as University of St Andrews. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Sustainable Power and Research Campus approved and built?
The application was submitted on 21 January 2014. Permission was granted on 10 February 2014, 1 months later. The site became operational on 7 December 2016, 34 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4730.