Renewable sites › Sustainable Power and Research Campus
Sustainable Power and Research Campus
Sustainable Power and Research Campus is operational in Fife with a recorded capacity of 6.5 MW, and has been generating since 2016-12-07.
Planning and build timeline
| Application submitted | 2014-01-21 |
| Permission granted | 2014-02-10 1 months after submission |
| Operational | 2016-12-07 34 months after consent |
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Eden Campus Solar Photovoltaics · Operational | 1 | 0.1 km |
Wormit Solar Farm Solar Photovoltaics · Operational | 4 | 7.2 km |
Cupar Wastewater Treatment Works Solar Farm Solar Photovoltaics · Operational | 0.62 | 7.8 km |
Ferrymuir Battery · Under Construction | 49.9 | 11.1 km |
Harris Academy, Perth Road - Extension/Roof Solar Photovoltaic Array Solar Photovoltaics · Under Construction | — | 12.5 km |
Michelin Tyre Co Ltd - Dundee Wind Onshore · Operational | 4 | 13.2 km |
Baldovie Industrial Estate (Forties Road) EfW Incineration · Under Construction | 10 | 13.4 km |
Baldovie EfW Incineration · Operational | 8.3 | 13.6 km |
How big is Sustainable Power and Research Campus?
Sustainable Power and Research Campus has a recorded installed capacity of 6.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Sustainable Power and Research Campus?
REPD records the operator as University of St Andrews. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Sustainable Power and Research Campus approved and built?
The application was submitted on 2014-01-21. Permission was granted on 2014-02-10, 1 months later. The site became operational on 2016-12-07, 34 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4730.