Sustainable Power and Research Campus is an operational 6.5 MW biomass plant in Fife, generating since 7 December 2016. Planning permission was granted on 10 February 2014, 1 months after submission. Operator of record: University of St Andrews.

6.5 MW
Capacity
as recorded in REPD
Operational
Status
since 7 December 2016
Biomass (dedicated)
Technology
University of St Andrews
Fife
Authority
Scotland

Planning and build timeline

Application submitted21 January 2014
Permission granted10 February 2014
1 months after submission
Operational7 December 2016
34 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Fife: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Sustainable Power and Research Campus’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
10.1 km
Solar Photovoltaics · Operational
47.2 km
Solar Photovoltaics · Operational
0.627.8 km
Battery · Under Construction
49.911.1 km
Solar Photovoltaics · Under Construction
12.5 km
Wind Onshore · Operational
413.2 km
EfW Incineration · Under Construction
1013.4 km
EfW Incineration · Operational
8.313.6 km

How big is Sustainable Power and Research Campus?

Sustainable Power and Research Campus has a recorded installed capacity of 6.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Sustainable Power and Research Campus?

REPD records the operator as University of St Andrews. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Sustainable Power and Research Campus approved and built?

The application was submitted on 21 January 2014. Permission was granted on 10 February 2014, 1 months later. The site became operational on 7 December 2016, 34 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4730.