Cupar Wastewater Treatment Works Solar Farm

Cupar Wastewater Treatment Works Solar Farm is operational in Fife with a recorded capacity of 0.62 MW, and has been generating since 2021-07-19.

0.62 MW
Capacity
as recorded in REPD
Operational
Status
since 2021-07-19
Solar Photovoltaics
Technology
Scottish Water (Dundee)
Fife
Authority
Scotland

Planning and build timeline

Application submitted2020-10-23
Permission granted2021-01-19
3 months after submission
Operational2021-07-19
6 months after consent

Fife’s record on solar

Fife has decided 31 solar farms and approved 100%, taking a median of 3.7 months. See every solar farm decision in Fife

Other built sites within 15 km

SiteMWDistance
Ferrymuir
Battery · Under Construction
49.93.4 km
Sustainable Power and Research Campus
Biomass (dedicated) · Operational
6.57.8 km
Eden Campus
Solar Photovoltaics · Operational
17.9 km
Lower Melville Wood
Landfill Gas · Operational
19.3 km
Wormit Solar Farm
Solar Photovoltaics · Operational
410.5 km
Banbeath Industrial Estate Solar Array
Solar Photovoltaics · Under Construction
4.1913.9 km
Harris Academy, Perth Road - Extension/Roof Solar Photovoltaic Array
Solar Photovoltaics · Under Construction
14.9 km

How big is Cupar Wastewater Treatment Works Solar Farm?

Cupar Wastewater Treatment Works Solar Farm has a recorded installed capacity of 0.62 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Cupar Wastewater Treatment Works Solar Farm?

REPD records the operator as Scottish Water (Dundee). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Cupar Wastewater Treatment Works Solar Farm approved and built?

The application was submitted on 2020-10-23. Permission was granted on 2021-01-19, 3 months later. The site became operational on 2021-07-19, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8205.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council