Planning and build timeline
| Application submitted | 2020-10-23 |
| Permission granted | 2021-01-19 3 months after submission |
| Operational | 2021-07-19 6 months after consent |
Fife’s record on solar
Fife has decided 31 solar farms and approved 100%, taking a median of 3.7 months. See every solar farm decision in Fife →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Ferrymuir Battery · Under Construction | 49.9 | 3.4 km |
Sustainable Power and Research Campus Biomass (dedicated) · Operational | 6.5 | 7.8 km |
Eden Campus Solar Photovoltaics · Operational | 1 | 7.9 km |
Lower Melville Wood Landfill Gas · Operational | 1 | 9.3 km |
Wormit Solar Farm Solar Photovoltaics · Operational | 4 | 10.5 km |
Banbeath Industrial Estate Solar Array Solar Photovoltaics · Under Construction | 4.19 | 13.9 km |
Harris Academy, Perth Road - Extension/Roof Solar Photovoltaic Array Solar Photovoltaics · Under Construction | — | 14.9 km |
How big is Cupar Wastewater Treatment Works Solar Farm?
Cupar Wastewater Treatment Works Solar Farm has a recorded installed capacity of 0.62 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Cupar Wastewater Treatment Works Solar Farm?
REPD records the operator as Scottish Water (Dundee). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Cupar Wastewater Treatment Works Solar Farm approved and built?
The application was submitted on 2020-10-23. Permission was granted on 2021-01-19, 3 months later. The site became operational on 2021-07-19, 6 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8205.