Baldovie Industrial Estate (Forties Road) is a 10 MW energy-from-waste plant under construction in Dundee City. Planning permission was granted on 21 March 2017, 3 months after submission. Operator of record: MVV Environment.

10 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
EfW Incineration
Technology
MVV Environment
Dundee City
Authority
Scotland

Planning and build timeline

Application submitted22 December 2016
Permission granted21 March 2017
3 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Dundee City: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Baldovie Industrial Estate (Forties Road)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
EfW Incineration · Operational
8.30.2 km
Wind Onshore · Operational
40.5 km
Battery · Operational
49.96.8 km
Solar Photovoltaics · Under Construction
7.4 km
Solar Photovoltaics · Operational
48.5 km
Battery · Operational
49.99.4 km
Wind Onshore · Operational
6.413.2 km
Solar Photovoltaics · Operational
113.3 km

How big is Baldovie Industrial Estate (Forties Road)?

Baldovie Industrial Estate (Forties Road) has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Baldovie Industrial Estate (Forties Road)?

REPD records the operator as MVV Environment. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Baldovie Industrial Estate (Forties Road) approved and built?

The application was submitted on 22 December 2016. Permission was granted on 21 March 2017, 3 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6171.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode