Baldovie is an operational 8.3 MW energy-from-waste plant in Dundee City, generating since 31 March 2000. Planning permission was granted on 18 March 1996, 18 months after submission. Operator of record: Dundee Energy Recycling.

8.3 MW
Capacity
as recorded in REPD
Operational
Status
since 31 March 2000
EfW Incineration
Technology
Dundee Energy Recycling
Dundee City
Authority
Scotland

Planning and build timeline

Application submitted9 September 1994
Permission granted18 March 1996
18 months after submission
Operational31 March 2000
48 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Dundee City: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Baldovie’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
EfW Incineration · Under Construction
100.2 km
Wind Onshore · Operational
40.7 km
Battery · Operational
49.96.8 km
Solar Photovoltaics · Under Construction
7.4 km
Solar Photovoltaics · Operational
48.7 km
Battery · Operational
49.99.4 km
Wind Onshore · Operational
6.413 km
Solar Photovoltaics · Operational
113.5 km

How big is Baldovie?

Baldovie has a recorded installed capacity of 8.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Baldovie?

REPD records the operator as Dundee Energy Recycling. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Baldovie approved and built?

The application was submitted on 9 September 1994. Permission was granted on 18 March 1996, 18 months later. The site became operational on 31 March 2000, 48 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 874.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode