Baldovie is an operational 8.3 MW energy-from-waste plant in Dundee City, generating since 31 March 2000. Planning permission was granted on 18 March 1996, 18 months after submission. Operator of record: Dundee Energy Recycling.
Planning and build timeline
| Application submitted | 9 September 1994 |
| Permission granted | 18 March 1996 18 months after submission |
| Operational | 31 March 2000 48 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Dundee City: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Baldovie’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
EfW Incineration · Under Construction | 10 | 0.2 km |
Wind Onshore · Operational | 4 | 0.7 km |
Battery · Operational | 49.9 | 6.8 km |
Solar Photovoltaics · Under Construction | — | 7.4 km |
Solar Photovoltaics · Operational | 4 | 8.7 km |
Battery · Operational | 49.9 | 9.4 km |
Wind Onshore · Operational | 6.4 | 13 km |
Solar Photovoltaics · Operational | 1 | 13.5 km |
How big is Baldovie?
Baldovie has a recorded installed capacity of 8.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Baldovie?
REPD records the operator as Dundee Energy Recycling. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Baldovie approved and built?
The application was submitted on 9 September 1994. Permission was granted on 18 March 1996, 18 months later. The site became operational on 31 March 2000, 48 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 874.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode