Renewable sitesBaldovie

Baldovie

Baldovie is operational in Dundee City with a recorded capacity of 8.3 MW, and has been generating since 2000-03-31.

8.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2000-03-31
EfW Incineration
Technology
Dundee Energy Recycling
Dundee City
Authority
Scotland

Planning and build timeline

Application submitted1994-09-09
Permission granted1996-03-18
18 months after submission
Operational2000-03-31
48 months after consent

Other built sites within 15 km

SiteMWDistance
Baldovie Industrial Estate (Forties Road)
EfW Incineration · Under Construction
100.2 km
Michelin Tyre Co Ltd - Dundee
Wind Onshore · Operational
40.7 km
Dunsinane Industrial Estate
Battery · Operational
49.96.8 km
Harris Academy, Perth Road - Extension/Roof Solar Photovoltaic Array
Solar Photovoltaics · Under Construction
7.4 km
Wormit Solar Farm
Solar Photovoltaics · Operational
48.7 km
Dundee Technology Park
Battery · Operational
49.99.4 km
Ark Hill
Wind Onshore · Operational
6.413 km
Eden Campus
Solar Photovoltaics · Operational
113.5 km

How big is Baldovie?

Baldovie has a recorded installed capacity of 8.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Baldovie?

REPD records the operator as Dundee Energy Recycling. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Baldovie approved and built?

The application was submitted on 1994-09-09. Permission was granted on 1996-03-18, 18 months later. The site became operational on 2000-03-31, 48 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 874.