Renewable sites › Ferrymuir
Ferrymuir
Ferrymuir is a 49.9 MW battery storage site under construction in Fife. Planning permission was granted on 10 January 2020, 4 months after submission. Operator of record: Gore Street Energy Storage Fund.
Planning and build timeline
| Application submitted | 23 September 2019 |
| Permission granted | 10 January 2020 4 months after submission |
| Operational | not recorded |
Screening a site of your own?
Fife approves 96% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Ferrymuir’s recorded coordinate — swap in your own postcode or coordinates.
Fife’s record on battery storage
Fife has decided 23 battery storage schemes and approved 96%, taking a median of 3.9 months. See every battery storage scheme decision in Fife →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 0.62 | 3.4 km |
Landfill Gas · Operational | 1 | 5.9 km |
Biomass (dedicated) · Operational | 6.5 | 11.1 km |
Solar Photovoltaics · Operational | 1 | 11.2 km |
Solar Photovoltaics · Under Construction | 4.19 | 12.4 km |
Solar Photovoltaics · Operational | 4 | 12.7 km |
Biomass (dedicated) · Operational | 5.5 | 13.5 km |
Biomass (dedicated) · Operational | 65 | 14.3 km |
How big is Ferrymuir?
Ferrymuir has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Ferrymuir?
REPD records the operator as Gore Street Energy Storage Fund. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Ferrymuir approved and built?
The application was submitted on 23 September 2019. Permission was granted on 10 January 2020, 4 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7371.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode