Renewable sites › Michelin Tyre Co Ltd - Dundee
Michelin Tyre Co Ltd - Dundee
Michelin Tyre Co Ltd - Dundee is an operational 4 MW onshore wind farm in Dundee City, generating since 20 May 2006. Planning permission was granted on 26 September 2004, 16 months after submission. Operator of record: Ecotricity.
Planning and build timeline
| Application submitted | 30 May 2003 |
| Permission granted | 26 September 2004 16 months after submission |
| Operational | 20 May 2006 20 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Dundee City: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Michelin Tyre Co Ltd - Dundee’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
EfW Incineration · Under Construction | 10 | 0.5 km |
EfW Incineration · Operational | 8.3 | 0.7 km |
Battery · Operational | 49.9 | 7.3 km |
Solar Photovoltaics · Under Construction | — | 7.8 km |
Solar Photovoltaics · Operational | 4 | 8.7 km |
Battery · Operational | 49.9 | 9.9 km |
Solar Photovoltaics · Operational | 1 | 13.2 km |
Biomass (dedicated) · Operational | 6.5 | 13.2 km |
How big is Michelin Tyre Co Ltd - Dundee?
Michelin Tyre Co Ltd - Dundee has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Michelin Tyre Co Ltd - Dundee?
REPD records the operator as Ecotricity. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Michelin Tyre Co Ltd - Dundee approved and built?
The application was submitted on 30 May 2003. Permission was granted on 26 September 2004, 16 months later. The site became operational on 20 May 2006, 20 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4681.