Renewable sitesSummerston Landfill

Summerston Landfill

Summerston Landfill is operational in Glasgow City with a recorded capacity of 2.8 MW, and has been generating since 1999-07-28.

2.8 MW
Capacity
as recorded in REPD
Operational
Status
since 1999-07-28
Landfill Gas
Technology
Combined Landfill Projects (CLP)
Glasgow City
Authority
Scotland

Planning and build timeline

Application submitted1998-03-30
Permission granted1998-12-01
8 months after submission
Operational1999-07-28
8 months after consent

Other built sites within 15 km

SiteMWDistance
Mugdock Water Treatment Works - Solar panels
Solar Photovoltaics · Operational
0.754.7 km
Barclays Glasgow Campus, Plot 4 - Energy Sustainability Centre
EfW Incineration · Operational
7.1 km
South Clyde Energy Centre
EfW Incineration · Under Construction
458.1 km
Hutchesons Grammar School
Solar Photovoltaics · Operational
0.189 km
Scottish Water, Buchanan Gate - Hydro Energy Scheme
Large Hydro · Under Construction
9.3 km
Buchanan Gate, Stepps - Solar Panels
Solar Photovoltaics · Under Construction
0.869.4 km
Glasgow Renewable Energy and Recycling Centre (ACT)
Advanced Conversion Technologies · Operational
109.5 km
Glasgow Renewable Energy and Recycling Centre (Waste AD)
Anaerobic Digestion · Operational
59.5 km

How big is Summerston Landfill?

Summerston Landfill has a recorded installed capacity of 2.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Summerston Landfill?

REPD records the operator as Combined Landfill Projects (CLP). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Summerston Landfill approved and built?

The application was submitted on 1998-03-30. Permission was granted on 1998-12-01, 8 months later. The site became operational on 1999-07-28, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 734.