Novarly ParcelRenewable sites

Renewable sitesGlasgow Renewable Energy and Recycling Centre (Waste AD)

Glasgow Renewable Energy and Recycling Centre (Waste AD)

Glasgow Renewable Energy and Recycling Centre (Waste AD) is operational in Glasgow City with a recorded capacity of 5 MW, and has been generating since 2017-12-15.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-12-15
Anaerobic Digestion
Technology
Viridor
Glasgow City
Authority
Scotland

Planning and build timeline

Application submitted2012-08-14
Permission granted2013-01-29
6 months after submission
Operational2017-12-15
59 months after consent

Other built sites within 15 km

SiteMWDistance
Glasgow Renewable Energy and Recycling Centre (ACT)
Advanced Conversion Technologies · Operational
100 km
Hutchesons Grammar School
Solar Photovoltaics · Operational
0.182.3 km
Barclays Glasgow Campus, Plot 4 - Energy Sustainability Centre
EfW Incineration · Operational
2.5 km
Cathkin Braes Wind Farm (Castlemilk)
Wind Onshore · Operational
34.5 km
South Cathkin Landfill Site
Landfill Gas · Operational
7.45.7 km
Greenoakhill
Landfill Gas · Operational
3.97.1 km
South Clyde Energy Centre
EfW Incineration · Under Construction
457.7 km
Tennant Avenue College, East Kilbride - Solar Panels
Solar Photovoltaics · Under Construction
0.947.9 km

How big is Glasgow Renewable Energy and Recycling Centre (Waste AD)?

Glasgow Renewable Energy and Recycling Centre (Waste AD) has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Glasgow Renewable Energy and Recycling Centre (Waste AD)?

REPD records the operator as Viridor. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Glasgow Renewable Energy and Recycling Centre (Waste AD) approved and built?

The application was submitted on 2012-08-14. Permission was granted on 2013-01-29, 6 months later. The site became operational on 2017-12-15, 59 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 286.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council