Renewable sitesGlasgow Renewable Energy and Recycling Centre (ACT)

Glasgow Renewable Energy and Recycling Centre (ACT)

Glasgow Renewable Energy and Recycling Centre (ACT) is an operational 10 MW advanced conversion plant in Glasgow City, generating since 1 August 2019. Planning permission was granted on 29 January 2013, 6 months after submission. Operator of record: Viridor.

10 MW
Capacity
as recorded in REPD
Operational
Status
since 1 August 2019
Advanced Conversion Technologies
Technology
Viridor
Glasgow City
Authority
Scotland

Planning and build timeline

Application submitted14 August 2012
Permission granted29 January 2013
6 months after submission
Operational1 August 2019
78 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Glasgow City: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Glasgow Renewable Energy and Recycling Centre (ACT)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
50 km
Solar Photovoltaics · Operational
0.182.3 km
EfW Incineration · Operational
2.5 km
Wind Onshore · Operational
34.5 km
Landfill Gas · Operational
7.45.7 km
Landfill Gas · Operational
3.97.1 km
EfW Incineration · Under Construction
457.7 km
Solar Photovoltaics · Under Construction
0.947.9 km

How big is Glasgow Renewable Energy and Recycling Centre (ACT)?

Glasgow Renewable Energy and Recycling Centre (ACT) has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Glasgow Renewable Energy and Recycling Centre (ACT)?

REPD records the operator as Viridor. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Glasgow Renewable Energy and Recycling Centre (ACT) approved and built?

The application was submitted on 14 August 2012. Permission was granted on 29 January 2013, 6 months later. The site became operational on 1 August 2019, 78 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 928.