Renewable sites › Buchanan Gate, Stepps - Solar Panels
Buchanan Gate, Stepps - Solar Panels
Buchanan Gate, Stepps - Solar Panels is under construction in North Lanarkshire with a recorded capacity of 0.86 MW.
Planning and build timeline
| Application submitted | 2024-04-22 |
| Permission granted | 2024-05-17 1 months after submission |
| Operational | not recorded |
North Lanarkshire’s record on solar
North Lanarkshire has decided 14 solar farms and approved 100%, taking a median of 1.1 months. See every solar farm decision in North Lanarkshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Scottish Water, Buchanan Gate - Hydro Energy Scheme Large Hydro · Under Construction | — | 0.1 km |
Greenoakhill Landfill Gas · Operational | 3.9 | 6.1 km |
Henry Colbeck Office Solar Photovoltaics · Operational | 0.2 | 8.5 km |
Summerston Landfill Landfill Gas · Operational | 2.8 | 9.4 km |
Barclays Glasgow Campus, Plot 4 - Energy Sustainability Centre EfW Incineration · Operational | — | 9.4 km |
Coatbridge Material Recovery and Renewable Energy Facility Advanced Conversion Technologies · Under Construction | 25 | 9.7 km |
Glasgow Renewable Energy and Recycling Centre (ACT) Advanced Conversion Technologies · Operational | 10 | 9.8 km |
Glasgow Renewable Energy and Recycling Centre (Waste AD) Anaerobic Digestion · Operational | 5 | 9.8 km |
How big is Buchanan Gate, Stepps - Solar Panels?
Buchanan Gate, Stepps - Solar Panels has a recorded installed capacity of 0.86 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Buchanan Gate, Stepps - Solar Panels?
REPD records the operator as Scottish Water. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Buchanan Gate, Stepps - Solar Panels approved and built?
The application was submitted on 2024-04-22. Permission was granted on 2024-05-17, 1 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14217.
Novarly Parcel · official public data, read properly · parcel.novarly.com