Renewable sitesSouth Clyde Energy Centre

South Clyde Energy Centre

South Clyde Energy Centre is a 45 MW energy-from-waste plant under construction in Glasgow City. Planning permission was granted on 14 December 2012, 6 months after submission. Operator of record: Fortum (formerly Peel Environmental).

45 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
EfW Incineration
Technology
Fortum (formerly Peel Environmental)
Glasgow City
Authority
Scotland

Planning and build timeline

Application submitted25 June 2012
Permission granted14 December 2012
6 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Glasgow City: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with South Clyde Energy Centre’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Battery · Under Construction
4.5 km
Solar Photovoltaics · Under Construction
19.94.5 km
Battery · Under Construction
504.8 km
Solar Photovoltaics · Operational
0.185.5 km
EfW Incineration · Operational
6 km
Advanced Conversion Technologies · Operational
107.7 km
Anaerobic Digestion · Operational
57.7 km
Landfill Gas · Operational
2.88.1 km

How big is South Clyde Energy Centre?

South Clyde Energy Centre has a recorded installed capacity of 45 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates South Clyde Energy Centre?

REPD records the operator as Fortum (formerly Peel Environmental). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was South Clyde Energy Centre approved and built?

The application was submitted on 25 June 2012. Permission was granted on 14 December 2012, 6 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1009.