Renewable sites › South Clyde Energy Centre
South Clyde Energy Centre
South Clyde Energy Centre is a 45 MW energy-from-waste plant under construction in Glasgow City. Planning permission was granted on 14 December 2012, 6 months after submission. Operator of record: Fortum (formerly Peel Environmental).
Planning and build timeline
| Application submitted | 25 June 2012 |
| Permission granted | 14 December 2012 6 months after submission |
| Operational | not recorded |
Screening a site of your own?
Redline runs the record on your own boundary in Glasgow City: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with South Clyde Energy Centre’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Battery · Under Construction | — | 4.5 km |
Solar Photovoltaics · Under Construction | 19.9 | 4.5 km |
Battery · Under Construction | 50 | 4.8 km |
Solar Photovoltaics · Operational | 0.18 | 5.5 km |
EfW Incineration · Operational | — | 6 km |
Advanced Conversion Technologies · Operational | 10 | 7.7 km |
Anaerobic Digestion · Operational | 5 | 7.7 km |
Landfill Gas · Operational | 2.8 | 8.1 km |
How big is South Clyde Energy Centre?
South Clyde Energy Centre has a recorded installed capacity of 45 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates South Clyde Energy Centre?
REPD records the operator as Fortum (formerly Peel Environmental). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was South Clyde Energy Centre approved and built?
The application was submitted on 25 June 2012. Permission was granted on 14 December 2012, 6 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1009.