Renewable sites › Barclays Glasgow Campus, Plot 4 - Energy Sustainability Centre
Barclays Glasgow Campus, Plot 4 - Energy Sustainability Centre
Barclays Glasgow Campus, Plot 4 - Energy Sustainability Centre is operational in Glasgow City, and has been generating since 2022-01-01.
Planning and build timeline
| Application submitted | 2021-01-21 |
| Permission granted | 2021-07-21 6 months after submission |
| Operational | 2022-01-01 5 months after consent |
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Hutchesons Grammar School Solar Photovoltaics · Operational | 0.18 | 2.3 km |
Glasgow Renewable Energy and Recycling Centre (ACT) Advanced Conversion Technologies · Operational | 10 | 2.5 km |
Glasgow Renewable Energy and Recycling Centre (Waste AD) Anaerobic Digestion · Operational | 5 | 2.5 km |
South Clyde Energy Centre EfW Incineration · Under Construction | 45 | 6 km |
Cathkin Braes Wind Farm (Castlemilk) Wind Onshore · Operational | 3 | 7 km |
Summerston Landfill Landfill Gas · Operational | 2.8 | 7.1 km |
South Cathkin Landfill Site Landfill Gas · Operational | 7.4 | 8.2 km |
Greenoakhill Landfill Gas · Operational | 3.9 | 8.4 km |
How big is Barclays Glasgow Campus, Plot 4 - Energy Sustainability Centre?
REPD does not record an installed capacity for Barclays Glasgow Campus, Plot 4 - Energy Sustainability Centre.
Who operates Barclays Glasgow Campus, Plot 4 - Energy Sustainability Centre?
REPD records the operator as Barclays Execution Services Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Barclays Glasgow Campus, Plot 4 - Energy Sustainability Centre approved and built?
The application was submitted on 2021-01-21. Permission was granted on 2021-07-21, 6 months later. The site became operational on 2022-01-01, 5 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8806.