Novarly ParcelRenewable sites

Renewable sitesMugdock Water Treatment Works - Solar panels

Mugdock Water Treatment Works - Solar panels

Mugdock Water Treatment Works - Solar panels is operational in East Dunbartonshire with a recorded capacity of 0.75 MW, and has been generating since 2025-06-01.

0.75 MW
Capacity
as recorded in REPD
Operational
Status
since 2025-06-01
Solar Photovoltaics
Technology
Scottish Water National Operations Control Centre
East Dunbartonshire
Authority
Scotland

Planning and build timeline

Application submitted2024-03-19
Permission granted2024-05-16
2 months after submission
Operational2025-06-01
13 months after consent

Other built sites within 15 km

SiteMWDistance
Summerston Landfill
Landfill Gas · Operational
2.84.7 km
South Clyde Energy Centre
EfW Incineration · Under Construction
4510.9 km
Barclays Glasgow Campus, Plot 4 - Energy Sustainability Centre
EfW Incineration · Operational
11.6 km
Glasgow Airport Solar Farm
Solar Photovoltaics · Under Construction
19.912.8 km
Glasgow Airport Solar Farm
Battery · Under Construction
12.8 km
Scottish Water, Buchanan Gate - Hydro Energy Scheme
Large Hydro · Under Construction
12.9 km
Buchanan Gate, Stepps - Solar Panels
Solar Photovoltaics · Under Construction
0.8612.9 km
Hutchesons Grammar School
Solar Photovoltaics · Operational
0.1813.4 km

How big is Mugdock Water Treatment Works - Solar panels?

Mugdock Water Treatment Works - Solar panels has a recorded installed capacity of 0.75 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Mugdock Water Treatment Works - Solar panels?

REPD records the operator as Scottish Water National Operations Control Centre. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Mugdock Water Treatment Works - Solar panels approved and built?

The application was submitted on 2024-03-19. Permission was granted on 2024-05-16, 2 months later. The site became operational on 2025-06-01, 13 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 16120.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council