Renewable sites › Mugdock Water Treatment Works - Solar panels
Mugdock Water Treatment Works - Solar panels
Mugdock Water Treatment Works - Solar panels is an operational 0.75 MW solar farm in East Dunbartonshire, generating since 1 June 2025. Planning permission was granted on 16 May 2024, 2 months after submission. Operator of record: Scottish Water National Operations Control Centre.
Planning and build timeline
| Application submitted | 19 March 2024 |
| Permission granted | 16 May 2024 2 months after submission |
| Operational | 1 June 2025 13 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in East Dunbartonshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Mugdock Water Treatment Works - Solar panels’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Landfill Gas · Operational | 2.8 | 4.7 km |
EfW Incineration · Under Construction | 45 | 10.9 km |
EfW Incineration · Operational | — | 11.6 km |
Battery · Under Construction | — | 12.8 km |
Solar Photovoltaics · Under Construction | 19.9 | 12.8 km |
Large Hydro · Under Construction | — | 12.9 km |
Solar Photovoltaics · Under Construction | 0.86 | 12.9 km |
Solar Photovoltaics · Operational | 0.18 | 13.4 km |
How big is Mugdock Water Treatment Works - Solar panels?
Mugdock Water Treatment Works - Solar panels has a recorded installed capacity of 0.75 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Mugdock Water Treatment Works - Solar panels?
REPD records the operator as Scottish Water National Operations Control Centre. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Mugdock Water Treatment Works - Solar panels approved and built?
The application was submitted on 19 March 2024. Permission was granted on 16 May 2024, 2 months later. The site became operational on 1 June 2025, 13 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 16120.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode