Hutchesons Grammar School
Hutchesons Grammar School is an operational 0.18 MW solar farm in Glasgow City, generating since 1 January 2021. Planning permission was granted on 18 June 2020, 4 months after submission. Operator of record: Hutchesons Educational Trust / Intelligent Alternatives.
Planning and build timeline
| Application submitted | 3 March 2020 |
| Permission granted | 18 June 2020 4 months after submission |
| Operational | 1 January 2021 6 months after consent |
Screening a site of your own?
Glasgow City approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Hutchesons Grammar School’s recorded coordinate — swap in your own postcode or coordinates.
Glasgow City’s record on solar
Glasgow City has decided 19 solar farms and approved 100%, taking a median of 2.1 months. See every solar farm decision in Glasgow City →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
EfW Incineration · Operational | — | 2.3 km |
Anaerobic Digestion · Operational | 5 | 2.3 km |
Advanced Conversion Technologies · Operational | 10 | 2.3 km |
EfW Incineration · Under Construction | 45 | 5.5 km |
Wind Onshore · Operational | 3 | 6 km |
Landfill Gas · Operational | 7.4 | 7.4 km |
Wind Onshore · Operational | 12 | 7.8 km |
Landfill Gas · Operational | 2.8 | 9 km |
How big is Hutchesons Grammar School?
Hutchesons Grammar School has a recorded installed capacity of 0.18 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Hutchesons Grammar School?
REPD records the operator as Hutchesons Educational Trust / Intelligent Alternatives. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Hutchesons Grammar School approved and built?
The application was submitted on 3 March 2020. Permission was granted on 18 June 2020, 4 months later. The site became operational on 1 January 2021, 6 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7758.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode