Sudforth Lane (Kellingley Solar Farm) is an operational 5 MW solar farm in North Yorkshire, generating since 30 March 2017. Planning permission was granted on 7 August 2015, 4 months after submission. Operator of record: First Renewable Developments/ Harworth Group.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 30 March 2017
Solar Photovoltaics
Technology
First Renewable Developments/ Harworth Group
North Yorkshire
Authority
England

Planning and build timeline

Application submitted22 April 2015
Permission granted7 August 2015
4 months after submission
Operational30 March 2017
20 months after consent

Screening a site of your own?

RedlineUK · £39

North Yorkshire approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Sudforth Lane (Kellingley Solar Farm)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Yorkshire’s record on solar

North Yorkshire has decided 105 solar farms and approved 96%, taking a median of 2.7 months. See every solar farm decision in North Yorkshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
52.7 km
Solar Photovoltaics · Operational
2.42.7 km
Battery · Operational
205.3 km
Battery · Operational
1505.4 km
EfW Incineration · Operational
685.6 km
EfW Incineration · Operational
705.6 km
Battery · Under Construction
577.1 km
Battery · Under Construction
3207.2 km

How big is Sudforth Lane (Kellingley Solar Farm)?

Sudforth Lane (Kellingley Solar Farm) has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Sudforth Lane (Kellingley Solar Farm)?

REPD records the operator as First Renewable Developments/ Harworth Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Sudforth Lane (Kellingley Solar Farm) approved and built?

The application was submitted on 22 April 2015. Permission was granted on 7 August 2015, 4 months later. The site became operational on 30 March 2017, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5559.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode