Renewable sites › Knottingley B
Knottingley B
Knottingley B is operational in Wakefield with a recorded capacity of 2.4 MW, and has been generating since 2016-03-29.
Planning and build timeline
| Application submitted | 2015-10-20 |
| Permission granted | 2016-01-29 3 months after submission |
| Operational | 2016-03-29 2 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Wakefield’s record on solar
Wakefield has decided 33 solar farms and approved 94%, taking a median of 1.8 months. See every solar farm decision in Wakefield →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Knottingley A Solar Photovoltaics · Operational | 5 | 0 km |
Sudforth Lane (Kellingley Solar Farm) Solar Photovoltaics · Operational | 5 | 2.7 km |
Kirkhaw Lane Battery · Operational | 20 | 2.8 km |
Kirkhaw Lane - Battery Storage Energy Battery · Operational | 150 | 3 km |
Ferrybridge Multifuel 2 (FM2) EfW Incineration · Operational | 70 | 3 km |
Ferrybridge Multifuel 1 (FM1) EfW Incineration · Operational | 68 | 3 km |
Monk Fryston Battery Storage Battery · Under Construction | 320 | 5.9 km |
Monk Fryston Battery Storage Battery · Under Construction | 57 | 5.9 km |
How big is Knottingley B?
Knottingley B has a recorded installed capacity of 2.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Knottingley B?
REPD records the operator as Envantage Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Knottingley B approved and built?
The application was submitted on 2015-10-20. Permission was granted on 2016-01-29, 3 months later. The site became operational on 2016-03-29, 2 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6129.