Kirkhaw Lane

Kirkhaw Lane is an operational 20 MW battery storage site in Wakefield, generating since 1 May 2018. Planning permission was granted on 24 October 2019, 27 months after submission. Operator of record: Walker & Son (Hauliers) Limited.

20 MW
Capacity
as recorded in REPD
Operational
Status
since 1 May 2018
Battery
Technology
Walker & Son (Hauliers) Limited
Wakefield
Authority
England

Planning and build timeline

Application submitted17 July 2017
Permission granted24 October 2019
27 months after submission
Operational1 May 2018

Screening a site of your own?

RedlineUK · £39

Wakefield approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Kirkhaw Lane’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wakefield’s record on battery storage

Wakefield has decided 6 battery storage schemes and approved 100%, taking a median of 9.6 months. See every battery storage scheme decision in Wakefield

Other built sites within 15 km

SiteMWDistance
Battery · Operational
1500.3 km
EfW Incineration · Operational
680.4 km
EfW Incineration · Operational
700.4 km
Solar Photovoltaics · Operational
2.42.8 km
Solar Photovoltaics · Operational
52.8 km
Battery · Under Construction
3204 km
Battery · Under Construction
574.1 km
Solar Photovoltaics · Operational
55.3 km

How big is Kirkhaw Lane?

Kirkhaw Lane has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Kirkhaw Lane?

REPD records the operator as Walker & Son (Hauliers) Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Kirkhaw Lane approved and built?

The application was submitted on 17 July 2017. Permission was granted on 24 October 2019, 27 months later. The site became operational on 1 May 2018.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7148.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode