Renewable sitesKnottingley A

Knottingley A

Knottingley A is an operational 5 MW solar farm in Wakefield, generating since 29 March 2016. Planning permission was granted on 23 January 2015, 5 months after submission. Operator of record: Envantage Renewables.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 29 March 2016
Solar Photovoltaics
Technology
Envantage Renewables
Wakefield
Authority
England

Planning and build timeline

Application submitted26 August 2014
Permission granted23 January 2015
5 months after submission
Operational29 March 2016
14 months after consent

Screening a site of your own?

RedlineUK · £39

Wakefield approves 94% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Knottingley A’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wakefield’s record on solar

Wakefield has decided 33 solar farms and approved 94%, taking a median of 1.8 months. See every solar farm decision in Wakefield

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
2.40 km
Solar Photovoltaics · Operational
52.7 km
Battery · Operational
202.8 km
Battery · Operational
1503 km
EfW Incineration · Operational
683 km
EfW Incineration · Operational
703 km
Battery · Under Construction
3205.9 km
Battery · Under Construction
575.9 km

How big is Knottingley A?

Knottingley A has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Knottingley A?

REPD records the operator as Envantage Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Knottingley A approved and built?

The application was submitted on 26 August 2014. Permission was granted on 23 January 2015, 5 months later. The site became operational on 29 March 2016, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2264.