Novarly ParcelRenewable sites

Renewable sitesKnottingley A

Knottingley A

Knottingley A is operational in Wakefield with a recorded capacity of 5 MW, and has been generating since 2016-03-29.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-03-29
Solar Photovoltaics
Technology
Envantage Renewables
Wakefield
Authority
England

Planning and build timeline

Application submitted2014-08-26
Permission granted2015-01-23
5 months after submission
Operational2016-03-29
14 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wakefield’s record on solar

Wakefield has decided 33 solar farms and approved 94%, taking a median of 1.8 months. See every solar farm decision in Wakefield

Other built sites within 15 km

SiteMWDistance
Knottingley B
Solar Photovoltaics · Operational
2.40 km
Sudforth Lane (Kellingley Solar Farm)
Solar Photovoltaics · Operational
52.7 km
Kirkhaw Lane
Battery · Operational
202.8 km
Kirkhaw Lane - Battery Storage Energy
Battery · Operational
1503 km
Ferrybridge Multifuel 2 (FM2)
EfW Incineration · Operational
703 km
Ferrybridge Multifuel 1 (FM1)
EfW Incineration · Operational
683 km
Monk Fryston Battery Storage
Battery · Under Construction
3205.9 km
Monk Fryston Battery Storage
Battery · Under Construction
575.9 km

How big is Knottingley A?

Knottingley A has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Knottingley A?

REPD records the operator as Envantage Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Knottingley A approved and built?

The application was submitted on 2014-08-26. Permission was granted on 2015-01-23, 5 months later. The site became operational on 2016-03-29, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2264.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council