Ferrybridge Multifuel 1 (FM1) is operational in Wakefield with a recorded capacity of 68 MW, and has been generating since 2015-08-03.

68 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-08-03
EfW Incineration
Technology
Scottish and Southern Energy (SSE)
Wakefield
Authority
England

Planning and build timeline

Application submitted2009-10-29
Permission granted2011-10-31
24 months after submission
Operational2015-08-03
45 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Ferrybridge Multifuel 2 (FM2)
EfW Incineration · Operational
700 km
Kirkhaw Lane
Battery · Operational
200.4 km
Kirkhaw Lane - Battery Storage Energy
Battery · Operational
1500.6 km
Knottingley B
Solar Photovoltaics · Operational
2.43 km
Knottingley A
Solar Photovoltaics · Operational
53 km
Monk Fryston Battery Storage
Battery · Under Construction
3204.2 km
Monk Fryston Battery Storage
Battery · Under Construction
574.4 km
Sudforth Lane (Kellingley Solar Farm)
Solar Photovoltaics · Operational
55.6 km

How big is Ferrybridge Multifuel 1 (FM1)?

Ferrybridge Multifuel 1 (FM1) has a recorded installed capacity of 68 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ferrybridge Multifuel 1 (FM1)?

REPD records the operator as Scottish and Southern Energy (SSE). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ferrybridge Multifuel 1 (FM1) approved and built?

The application was submitted on 2009-10-29. Permission was granted on 2011-10-31, 24 months later. The site became operational on 2015-08-03, 45 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 116.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council