Monk Fryston Battery Storage

Monk Fryston Battery Storage is under construction in North Yorkshire with a recorded capacity of 320 MW.

320 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
SSE Renewables
North Yorkshire
Authority
England

Planning and build timeline

Application submitted2021-06-23
Permission granted2022-12-01
17 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Yorkshire’s record on battery storage

North Yorkshire has decided 29 battery storage schemes and approved 100%, taking a median of 10.5 months. See every battery storage scheme decision in North Yorkshire

Other built sites within 15 km

SiteMWDistance
Monk Fryston Battery Storage
Battery · Under Construction
570.2 km
Kirkhaw Lane - Battery Storage Energy
Battery · Operational
1503.7 km
Kirkhaw Lane
Battery · Operational
204 km
Ferrybridge Multifuel 2 (FM2)
EfW Incineration · Operational
704.2 km
Ferrybridge Multifuel 1 (FM1)
EfW Incineration · Operational
684.2 km
Kingspan Insulation Solar Installation
Solar Photovoltaics · Operational
55.3 km
Cranswick Country Foods, Seafox Court - Solar Panels
Solar Photovoltaics · Under Construction
0.655.3 km
Peckfield Quarry Landfill Scheme
Landfill Gas · Operational
3.95.8 km

How big is Monk Fryston Battery Storage?

Monk Fryston Battery Storage has a recorded installed capacity of 320 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Monk Fryston Battery Storage?

REPD records the operator as SSE Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Monk Fryston Battery Storage approved and built?

The application was submitted on 2021-06-23. Permission was granted on 2022-12-01, 17 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 15164.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council