Novarly ParcelRenewable sites

Renewable sitesFox Covert Solar Farm

Fox Covert Solar Farm

Fox Covert Solar Farm is an operational 22 MW solar farm in Buckinghamshire, generating since 12 October 2023. Planning permission was granted on 1 June 2021, 10 months after submission. Operator of record: Low Carbon.

22 MW
Capacity
as recorded in REPD
Operational
Status
since 12 October 2023
Solar Photovoltaics
Technology
Low Carbon
Buckinghamshire
Authority
England

Planning and build timeline

Application submitted3 August 2020
Permission granted1 June 2021
10 months after submission
Operational12 October 2023
28 months after consent

Screening a site of your own?

RedlineUK · £39

Buckinghamshire approves 90% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Fox Covert Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Buckinghamshire’s record on solar

Buckinghamshire has decided 59 solar farms and approved 90%, taking a median of 3 months. See every solar farm decision in Buckinghamshire

Other built sites within 15 km

SiteMWDistance
Battery · Operational
0.2 km
Solar Photovoltaics · Operational
55.4 km
Solar Photovoltaics · Operational
0.26.3 km
Solar Photovoltaics · Operational
76.5 km
Battery · Operational
79.96.6 km
Solar Photovoltaics · Operational
9.27.7 km
Solar Photovoltaics · Operational
128.6 km
EfW Incineration · Operational
228.6 km

How big is Fox Covert Solar Farm?

Fox Covert Solar Farm has a recorded installed capacity of 22 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Fox Covert Solar Farm?

REPD records the operator as Low Carbon. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Fox Covert Solar Farm approved and built?

The application was submitted on 3 August 2020. Permission was granted on 1 June 2021, 10 months later. The site became operational on 12 October 2023, 28 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7958.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode