Novarly ParcelRenewable sites

Renewable sitesStokeford Farm

Stokeford Farm

Stokeford Farm is operational in Dorset with a recorded capacity of 28.5 MW, and has been generating since 2024-07-31.

28.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2024-07-31
Solar Photovoltaics
Technology
Alaska (The Holme Estate)
Dorset
Authority
England

Planning and build timeline

Application submitted2015-08-19
Permission granted2015-10-28
2 months after submission
Operational2024-07-31
105 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Dorset’s record on solar

Dorset has decided 97 solar farms and approved 95%, taking a median of 3.7 months. See every solar farm decision in Dorset

Other built sites within 15 km

SiteMWDistance
Trigon Solar Farm
Solar Photovoltaics · Operational
72.7 km
Bottom Plain
Solar Photovoltaics · Operational
103 km
Woolbridge Solar Park
Solar Photovoltaics · Operational
53.2 km
Oaklands Plantation
Solar Photovoltaics · Operational
53.2 km
South Newton Farm
Solar Photovoltaics · Operational
11.37.9 km
Slepe Farm
Battery · Operational
0.38 km
North of Newton Farm
Solar Photovoltaics · Operational
38.7 km
Dolmans Hill (Redbridge Farm) Solar Arrays
Solar Photovoltaics · Operational
58.9 km

How big is Stokeford Farm?

Stokeford Farm has a recorded installed capacity of 28.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Stokeford Farm?

REPD records the operator as Alaska (The Holme Estate). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Stokeford Farm approved and built?

The application was submitted on 2015-08-19. Permission was granted on 2015-10-28, 2 months later. The site became operational on 2024-07-31, 105 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5659.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council