Novarly ParcelRenewable sites

Renewable sitesStokeford Farm

Stokeford Farm

Stokeford Farm is an operational 28.5 MW solar farm in Dorset, generating since 31 July 2024. Planning permission was granted on 28 October 2015, 2 months after submission. Operator of record: Alaska (The Holme Estate).

28.5 MW
Capacity
as recorded in REPD
Operational
Status
since 31 July 2024
Solar Photovoltaics
Technology
Alaska (The Holme Estate)
Dorset
Authority
England

Planning and build timeline

Application submitted19 August 2015
Permission granted28 October 2015
2 months after submission
Operational31 July 2024
105 months after consent

Screening a site of your own?

RedlineUK · £39

Dorset approves 95% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Stokeford Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Dorset’s record on solar

Dorset has decided 97 solar farms and approved 95%, taking a median of 3.7 months. See every solar farm decision in Dorset

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
72.7 km
Solar Photovoltaics · Operational
103 km
Solar Photovoltaics · Operational
53.2 km
Solar Photovoltaics · Operational
53.2 km
Solar Photovoltaics · Operational
11.37.9 km
Battery · Operational
0.38 km
Solar Photovoltaics · Operational
38.7 km
Solar Photovoltaics · Operational
58.9 km

How big is Stokeford Farm?

Stokeford Farm has a recorded installed capacity of 28.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Stokeford Farm?

REPD records the operator as Alaska (The Holme Estate). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Stokeford Farm approved and built?

The application was submitted on 19 August 2015. Permission was granted on 28 October 2015, 2 months later. The site became operational on 31 July 2024, 105 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5659.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode