Bottom Plain

Bottom Plain is an operational 10 MW solar farm in Dorset, generating since 4 December 2014. Planning permission was granted on 1 November 2013, 3 months after submission. Operator of record: Inazin Energy/Low Carbon.

10 MW
Capacity
as recorded in REPD
Operational
Status
since 4 December 2014
Solar Photovoltaics
Technology
Inazin Energy/Low Carbon
Dorset
Authority
England

Planning and build timeline

Application submitted2 August 2013
Permission granted1 November 2013
3 months after submission
Operational4 December 2014
13 months after consent

Screening a site of your own?

RedlineUK · £39

Dorset approves 95% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Bottom Plain’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 5 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Dorset’s record on solar

Dorset has decided 97 solar farms and approved 95%, taking a median of 3.7 months. See every solar farm decision in Dorset

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
70.6 km
Solar Photovoltaics · Operational
51.7 km
Solar Photovoltaics · Operational
28.53 km
Solar Photovoltaics · Operational
54.9 km
Battery · Operational
0.35.4 km
Solar Photovoltaics · Operational
11.35.4 km
Solar Photovoltaics · Operational
56.1 km
Solar Photovoltaics · Operational
36.1 km

How big is Bottom Plain?

Bottom Plain has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bottom Plain?

REPD records the operator as Inazin Energy/Low Carbon. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bottom Plain approved and built?

The application was submitted on 2 August 2013. Permission was granted on 1 November 2013, 3 months later. The site became operational on 4 December 2014, 13 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1973.