Dolmans Hill (Redbridge Farm) Solar Arrays

Dolmans Hill (Redbridge Farm) Solar Arrays is operational in Dorset with a recorded capacity of 5 MW, and has been generating since 2014-01-03.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-01-03
Solar Photovoltaics
Technology
Emotion Energy (Bournemouth) Limited
Dorset
Authority
England

Planning and build timeline

Application submitted2012-04-02
Permission granted2012-11-08
7 months after submission
Operational2014-01-03
14 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Dorset’s record on solar

Dorset has decided 97 solar farms and approved 95%, taking a median of 3.7 months. See every solar farm decision in Dorset

Other built sites within 15 km

SiteMWDistance
North of Newton Farm
Solar Photovoltaics · Operational
30.8 km
Slepe Farm
Battery · Operational
0.31.3 km
South Newton Farm
Solar Photovoltaics · Operational
11.31.7 km
Race farm
Solar Photovoltaics · Operational
6.13 km
Henbury Quarry
Solar Photovoltaics · Operational
3.94.7 km
Beacon Hill
Landfill Gas · Operational
35.2 km
Oaklands Plantation
Solar Photovoltaics · Operational
55.8 km
Bottom Plain
Solar Photovoltaics · Operational
106.1 km

How big is Dolmans Hill (Redbridge Farm) Solar Arrays?

Dolmans Hill (Redbridge Farm) Solar Arrays has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Dolmans Hill (Redbridge Farm) Solar Arrays?

REPD records the operator as Emotion Energy (Bournemouth) Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Dolmans Hill (Redbridge Farm) Solar Arrays approved and built?

The application was submitted on 2012-04-02. Permission was granted on 2012-11-08, 7 months later. The site became operational on 2014-01-03, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1589.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council