Renewable sites › Woolbridge Solar Park
Woolbridge Solar Park
Woolbridge Solar Park is an operational 5 MW solar farm in Dorset, generating since 18 June 2014. Planning permission was granted on 10 December 2013, 4 months after submission. Operator of record: Good Energy Generation.
Planning and build timeline
| Application submitted | 5 August 2013 |
| Permission granted | 10 December 2013 4 months after submission |
| Operational | 18 June 2014 6 months after consent |
Screening a site of your own?
Dorset approves 95% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Woolbridge Solar Park’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
- Nutrient-neutrality catchment — Poole Harbour SPA/Ramsar
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Dorset’s record on solar
Dorset has decided 97 solar farms and approved 95%, taking a median of 3.7 months. See every solar farm decision in Dorset →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 28.5 | 3.2 km |
Solar Photovoltaics · Operational | 7 | 4.3 km |
Solar Photovoltaics · Operational | 10 | 4.9 km |
Solar Photovoltaics · Operational | 5 | 5.9 km |
Solar Photovoltaics · Operational | 5 | 6.2 km |
Solar Photovoltaics · Operational | 5 | 6.6 km |
Solar Photovoltaics · Operational | 5 | 7.2 km |
Solar Photovoltaics · Operational | 5 | 7.2 km |
How big is Woolbridge Solar Park?
Woolbridge Solar Park has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Woolbridge Solar Park?
REPD records the operator as Good Energy Generation. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Woolbridge Solar Park approved and built?
The application was submitted on 5 August 2013. Permission was granted on 10 December 2013, 4 months later. The site became operational on 18 June 2014, 6 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1902.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode