Woolbridge Solar Park

Woolbridge Solar Park is operational in Dorset with a recorded capacity of 5 MW, and has been generating since 2014-06-18.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-06-18
Solar Photovoltaics
Technology
Good Energy Generation
Dorset
Authority
England

Planning and build timeline

Application submitted2013-08-05
Permission granted2013-12-10
4 months after submission
Operational2014-06-18
6 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Dorset’s record on solar

Dorset has decided 97 solar farms and approved 95%, taking a median of 3.7 months. See every solar farm decision in Dorset

Other built sites within 15 km

SiteMWDistance
Stokeford Farm
Solar Photovoltaics · Operational
28.53.2 km
Trigon Solar Farm
Solar Photovoltaics · Operational
74.3 km
Bottom Plain
Solar Photovoltaics · Operational
104.9 km
Oaklands Plantation
Solar Photovoltaics · Operational
55.9 km
Galton Manor Solar Park
Solar Photovoltaics · Operational
56.2 km
Holly Farm Solar Park
Solar Photovoltaics · Operational
56.6 km
Land at East Farm
Solar Photovoltaics · Operational
57.2 km
Crossways Pit Solar Farm
Solar Photovoltaics · Operational
57.2 km

How big is Woolbridge Solar Park?

Woolbridge Solar Park has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Woolbridge Solar Park?

REPD records the operator as Good Energy Generation. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Woolbridge Solar Park approved and built?

The application was submitted on 2013-08-05. Permission was granted on 2013-12-10, 4 months later. The site became operational on 2014-06-18, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1902.