Renewable sites › Stangate Landfill Site
Stangate Landfill Site
Stangate Landfill Site is an operational 4.5 MW landfill gas site in Tonbridge and Malling, generating since 1 February 1997. Planning permission was granted on 2 October 1995, 19 months after submission. Operator of record: ARC Ltd (Greenways Landfill).
Planning and build timeline
| Application submitted | 3 March 1994 |
| Permission granted | 2 October 1995 19 months after submission |
| Operational | 1 February 1997 16 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Tonbridge and Malling: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Stangate Landfill Site’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- National Landscape (AONB) — Kent Downs
- Green Belt — Tonbridge and Malling
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 4.7 | 4.1 km |
Landfill Gas · Operational | 1.2 | 4.4 km |
Solar Photovoltaics · Under Construction | 10.2 | 4.9 km |
Solar Photovoltaics · Operational | 3 | 6.2 km |
Solar Photovoltaics · Operational | 14.3 | 11.1 km |
Battery · Operational | 29 | 11.7 km |
Solar Photovoltaics · Operational | 6.6 | 12.5 km |
EfW Incineration · Operational | 51 | 13.5 km |
How big is Stangate Landfill Site?
Stangate Landfill Site has a recorded installed capacity of 4.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Stangate Landfill Site?
REPD records the operator as ARC Ltd (Greenways Landfill). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Stangate Landfill Site approved and built?
The application was submitted on 3 March 1994. Permission was granted on 2 October 1995, 19 months later. The site became operational on 1 February 1997, 16 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 581.