Novarly ParcelRenewable sites

Renewable sitesHadlow Place solar farm

Hadlow Place solar farm

Hadlow Place solar farm is operational in Tunbridge Wells with a recorded capacity of 14.3 MW, and has been generating since 2015-03-27.

14.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-03-27
Solar Photovoltaics
Technology
Hadlow Solar Park
Tunbridge Wells
Authority
England

Planning and build timeline

Application submitted2014-03-28
Permission granted2014-11-27
8 months after submission
Operational2015-03-27
4 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Tunbridge Wells’s record on solar

Tunbridge Wells has decided 20 solar farms and approved 80%, taking a median of 2.6 months. See every solar farm decision in Tunbridge Wells

Other built sites within 15 km

SiteMWDistance
Capel Grange Solar Park
Solar Photovoltaics · Operational
6.61.6 km
Paddock Wood
Solar Photovoltaics · Operational
9.25.2 km
Churn Lane, Horsmonden Solar Panels
Solar Photovoltaics · Operational
0.57 km
Maidstone Road, Horsmonden - Paddock Solar Farm
Solar Photovoltaics · Under Construction
49.97.8 km
Kingshill Solar Farm
Solar Photovoltaics · Operational
310.8 km
Stangate Landfill Site
Landfill Gas · Operational
4.511.1 km
Offham Landfill Site - Solar PV Array
Solar Photovoltaics · Under Construction
10.211.6 km
Offham Landfill Site Phase II
Landfill Gas · Operational
1.211.8 km

How big is Hadlow Place solar farm?

Hadlow Place solar farm has a recorded installed capacity of 14.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hadlow Place solar farm?

REPD records the operator as Hadlow Solar Park. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hadlow Place solar farm approved and built?

The application was submitted on 2014-03-28. Permission was granted on 2014-11-27, 8 months later. The site became operational on 2015-03-27, 4 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1905.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council