Renewable sites › Offham Landfill Site - Solar PV Array
Offham Landfill Site - Solar PV Array
Offham Landfill Site - Solar PV Array is a 10.2 MW solar farm under construction in Tonbridge and Malling. Planning permission was granted on 13 October 2023, 30 months after submission. Operator of record: Infinis Limited.
Planning and build timeline
| Application submitted | 20 April 2021 |
| Permission granted | 13 October 2023 30 months after submission |
| Operational | not recorded |
Screening a site of your own?
Tonbridge and Malling approves 88% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Offham Landfill Site - Solar PV Array’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
- Green Belt — Tonbridge and Malling
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Tonbridge and Malling’s record on solar
Tonbridge and Malling has decided 8 solar farms and approved 88%, taking a median of 1.8 months. See every solar farm decision in Tonbridge and Malling →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Landfill Gas · Operational | 1.2 | 0.5 km |
Solar Photovoltaics · Operational | 3 | 1.8 km |
Solar Photovoltaics · Operational | 4.7 | 2.3 km |
Landfill Gas · Operational | 4.5 | 4.9 km |
Battery · Operational | 29 | 6.9 km |
EfW Incineration · Operational | 51 | 8.7 km |
Solar Photovoltaics · Operational | 4.5 | 8.7 km |
Solar Photovoltaics · Operational | 14.3 | 11.6 km |
How big is Offham Landfill Site - Solar PV Array?
Offham Landfill Site - Solar PV Array has a recorded installed capacity of 10.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Offham Landfill Site - Solar PV Array?
REPD records the operator as Infinis Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Offham Landfill Site - Solar PV Array approved and built?
The application was submitted on 20 April 2021. Permission was granted on 13 October 2023, 30 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9002.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode