Aylesford BESS is operational in Tonbridge and Malling with a recorded capacity of 29 MW, and has been generating since 2020-06-01.
Planning and build timeline
| Application submitted | 2017-09-05 |
| Permission granted | 2017-12-05 3 months after submission |
| Operational | 2020-06-01 30 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
BIOSSENCE SOLAR PARK Solar Photovoltaics · Operational | 4.5 | 1.8 km |
Allington EFW EfW Incineration · Operational | 51 | 4 km |
Kingshill Solar Farm Solar Photovoltaics · Operational | 3 | 6.4 km |
Sundridge Hill Battery · Under Construction | 49.5 | 6.8 km |
Offham Landfill Site - Solar PV Array Solar Photovoltaics · Under Construction | 10.2 | 6.9 km |
Offham Landfill Site Phase II Landfill Gas · Operational | 1.2 | 7.3 km |
Land off Ford Lane Solar Photovoltaics · Operational | 4.7 | 7.9 km |
Stangate Landfill Site Landfill Gas · Operational | 4.5 | 11.7 km |
How big is Aylesford BESS?
Aylesford BESS has a recorded installed capacity of 29 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Aylesford BESS?
REPD records the operator as Zenobe. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Aylesford BESS approved and built?
The application was submitted on 2017-09-05. Permission was granted on 2017-12-05, 3 months later. The site became operational on 2020-06-01, 30 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 20398.