Novarly ParcelRenewable sites

Renewable sitesOffham Landfill Site Phase II

Offham Landfill Site Phase II

Offham Landfill Site Phase II is an operational 1.2 MW landfill gas site in Tonbridge and Malling, generating since 1 December 1996. Planning permission was granted on 29 August 1995, 18 months after submission. Operator of record: ARC Ltd (Greenways Landfill)/ Waste Recycling Group plc.

1.2 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 1996
Landfill Gas
Technology
ARC Ltd (Greenways Landfill)/ Waste Recycling Group plc
Tonbridge and Malling
Authority
England

Planning and build timeline

Application submitted4 March 1994
Permission granted29 August 1995
18 months after submission
Operational1 December 1996
15 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Tonbridge and Malling: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Offham Landfill Site Phase II’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
10.20.5 km
Solar Photovoltaics · Operational
4.71.9 km
Solar Photovoltaics · Operational
32.3 km
Landfill Gas · Operational
4.54.4 km
Battery · Operational
297.3 km
Solar Photovoltaics · Operational
4.59.1 km
EfW Incineration · Operational
519.2 km
Solar Photovoltaics · Operational
14.311.8 km

How big is Offham Landfill Site Phase II?

Offham Landfill Site Phase II has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Offham Landfill Site Phase II?

REPD records the operator as ARC Ltd (Greenways Landfill)/ Waste Recycling Group plc. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Offham Landfill Site Phase II approved and built?

The application was submitted on 4 March 1994. Permission was granted on 29 August 1995, 18 months later. The site became operational on 1 December 1996, 15 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 582.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode