Royd Moor is operational in Barnsley with a recorded capacity of 5.9 MW, and has been generating since 1993-12-01.

5.9 MW
Capacity
as recorded in REPD
Operational
Status
since 1993-12-01
Wind Onshore
Technology
Unknown
Barnsley
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1993-12-01

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Barnsley’s record on onshore wind

Barnsley has decided 7 onshore wind schemes and approved 71%, taking a median of 8.6 months. See every onshore wind scheme decision in Barnsley

Other built sites within 15 km

SiteMWDistance
Spicer Hill Wind Farm
Wind Onshore · Operational
6.91.6 km
Blackstone Edge
Wind Onshore · Operational
7.52.7 km
Hazlehead
Wind Onshore · Operational
64.1 km
Barnsley 1.5
Biomass (dedicated) · Operational
911 km
Barnsley Battery Energy Storage
Battery · Operational
4014.8 km
Stairfoot Battery Storage Facility
Battery · Operational
14.8 km

How big is Royd Moor?

Royd Moor has a recorded installed capacity of 5.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Royd Moor?

REPD records the operator as Unknown. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Royd Moor approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1993-12-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3432.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council