Renewable sitesRoyd Moor

Royd Moor

Royd Moor is an operational 5.9 MW onshore wind farm in Barnsley, generating since 1 December 1993. REPD does not record the planning grant date. Operator of record: Unknown.

5.9 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 1993
Wind Onshore
Technology
Unknown
Barnsley
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1 December 1993

Screening a site of your own?

RedlineUK · £39

Barnsley approves 71% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Royd Moor’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Barnsley’s record on onshore wind

Barnsley has decided 7 onshore wind schemes and approved 71%, taking a median of 8.6 months. See every onshore wind scheme decision in Barnsley

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
6.91.6 km
Wind Onshore · Operational
7.52.7 km
Wind Onshore · Operational
64.1 km
Biomass (dedicated) · Operational
911 km
Battery · Operational
4014.8 km
Battery · Operational
14.8 km

How big is Royd Moor?

Royd Moor has a recorded installed capacity of 5.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Royd Moor?

REPD records the operator as Unknown. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Royd Moor approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1 December 1993.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3432.