Hunters Race Solar Park is an operational 9.3 MW solar farm in Chichester, generating since 23 July 2014. Planning permission was granted on 13 May 2013, 3 months after submission. Operator of record: Aardvark Environment Matters.

9.3 MW
Capacity
as recorded in REPD
Operational
Status
since 23 July 2014
Solar Photovoltaics
Technology
Aardvark Environment Matters
Chichester
Authority
England

Planning and build timeline

Application submitted12 February 2013
Permission granted13 May 2013
3 months after submission
Operational23 July 2014
14 months after consent

Screening a site of your own?

RedlineUK · £39

Chichester approves 88% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Hunters Race Solar Park’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Chichester’s record on solar

Chichester has decided 24 solar farms and approved 88%, taking a median of 2.6 months. See every solar farm decision in Chichester

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
7.53.8 km
Anaerobic Digestion · Operational
2.24.2 km
Solar Photovoltaics · Operational
54.5 km
Solar Photovoltaics · Under Construction
0.195.5 km
Solar Photovoltaics · Operational
106.5 km
Solar Photovoltaics · Operational
56.6 km
Solar Photovoltaics · Operational
56.7 km
Solar Photovoltaics · Operational
68 km

How big is Hunters Race Solar Park?

Hunters Race Solar Park has a recorded installed capacity of 9.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hunters Race Solar Park?

REPD records the operator as Aardvark Environment Matters. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hunters Race Solar Park approved and built?

The application was submitted on 12 February 2013. Permission was granted on 13 May 2013, 3 months later. The site became operational on 23 July 2014, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2280.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode