Renewable sites › Glasgow Airport Solar Farm
Glasgow Airport Solar Farm
Glasgow Airport Solar Farm is a battery storage site under construction in Renfrewshire. Planning permission was granted on 6 April 2023, 5 months after submission. Operator of record: AGS Airports Limited.
Planning and build timeline
| Application submitted | 9 November 2022 |
| Permission granted | 6 April 2023 5 months after submission |
| Operational | not recorded |
Screening a site of your own?
Renfrewshire approves 83% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Glasgow Airport Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.
Renfrewshire’s record on battery storage
Renfrewshire has decided 6 battery storage schemes and approved 83%, taking a median of 4.9 months. See every battery storage scheme decision in Renfrewshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Under Construction | 19.9 | 0 km |
Battery · Under Construction | 50 | 2 km |
EfW Incineration · Under Construction | 45 | 4.5 km |
Solar Photovoltaics · Operational | 0.18 | 9.7 km |
EfW Incineration · Operational | — | 10.4 km |
Wind Onshore · Operational | 12 | 11.2 km |
Landfill Gas · Operational | 2.8 | 11.4 km |
Anaerobic Digestion · Operational | 5 | 12 km |
How big is Glasgow Airport Solar Farm?
REPD does not record an installed capacity for Glasgow Airport Solar Farm.
Who operates Glasgow Airport Solar Farm?
REPD records the operator as AGS Airports Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Glasgow Airport Solar Farm approved and built?
The application was submitted on 9 November 2022. Permission was granted on 6 April 2023, 5 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11096.
Novarly Parcel · official public data, read properly · parcel.novarly.com