Renewable sitesSixpenny Wood Windfarm

Sixpenny Wood Windfarm

Sixpenny Wood Windfarm is an operational 33 MW onshore wind farm in East Riding of Yorkshire, generating since 15 July 2013. Planning permission was granted on 8 December 2009, 29 months after submission. Operator of record: Greencoat UK Wind.

33 MW
Capacity
as recorded in REPD
Operational
Status
since 15 July 2013
Wind Onshore
Technology
Greencoat UK Wind
East Riding of Yorkshire
Authority
England

Planning and build timeline

Application submitted20 July 2007
Permission granted8 December 2009
29 months after submission
Operational15 July 2013
43 months after consent

Screening a site of your own?

RedlineUK · £39

East Riding of Yorkshire approves 82% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Sixpenny Wood Windfarm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Riding of Yorkshire’s record on onshore wind

East Riding of Yorkshire has decided 55 onshore wind schemes and approved 82%, taking a median of 7.8 months. See every onshore wind scheme decision in East Riding of Yorkshire

Other built sites within 15 km

SiteMWDistance
Biomass (dedicated) · Operational
0.94.5 km
Wind Onshore · Operational
12.56.4 km
Battery · Operational
408.4 km
Wind Onshore · Operational
34.98.4 km
Wind Onshore · Operational
1.38.6 km
Wind Onshore · Operational
249.1 km
Wind Onshore · Operational
32.89.5 km
Anaerobic Digestion · Operational
3.510.7 km

How big is Sixpenny Wood Windfarm?

Sixpenny Wood Windfarm has a recorded installed capacity of 33 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Sixpenny Wood Windfarm?

REPD records the operator as Greencoat UK Wind. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Sixpenny Wood Windfarm approved and built?

The application was submitted on 20 July 2007. Permission was granted on 8 December 2009, 29 months later. The site became operational on 15 July 2013, 43 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3942.