R G Walter & Sons, Golden Acre Site - Biomass Boilers is an operational 0.9 MW biomass plant in East Riding of Yorkshire, generating since 2 December 2020. Planning permission was granted on 27 July 2023, 4 months after submission. Operator of record: R G Walter & Sons Limited.

0.9 MW
Capacity
as recorded in REPD
Operational
Status
since 2 December 2020
Biomass (dedicated)
Technology
R G Walter & Sons Limited
East Riding of Yorkshire
Authority
England

Planning and build timeline

Application submitted11 April 2023
Permission granted27 July 2023
4 months after submission
Operational2 December 2020

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in East Riding of Yorkshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with R G Walter & Sons, Golden Acre Site - Biomass Boilers’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
12.54.4 km
Wind Onshore · Operational
334.5 km
Anaerobic Digestion · Operational
3.56.5 km
Landfill Gas · Operational
2.99.4 km
Wind Onshore · Operational
1.311.8 km
Battery · Operational
4012.3 km
Wind Onshore · Operational
34.912.9 km
Solar Photovoltaics · Under Construction
512.9 km

How big is R G Walter & Sons, Golden Acre Site - Biomass Boilers?

R G Walter & Sons, Golden Acre Site - Biomass Boilers has a recorded installed capacity of 0.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates R G Walter & Sons, Golden Acre Site - Biomass Boilers?

REPD records the operator as R G Walter & Sons Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was R G Walter & Sons, Golden Acre Site - Biomass Boilers approved and built?

The application was submitted on 11 April 2023. Permission was granted on 27 July 2023, 4 months later. The site became operational on 2 December 2020.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 13710.