Novarly ParcelRenewable sites

Renewable sitesHomestead Farm (Alderton)

Homestead Farm (Alderton)

Homestead Farm (Alderton) is an operational 17.6 MW solar farm in West Northamptonshire, generating since 30 March 2015. Planning permission was granted on 11 December 2014, 3 months after submission. Operator of record: CEE.

17.6 MW
Capacity
as recorded in REPD
Operational
Status
since 30 March 2015
Solar Photovoltaics
Technology
CEE
West Northamptonshire
Authority
England

Planning and build timeline

Application submitted11 September 2014
Permission granted11 December 2014
3 months after submission
Operational30 March 2015
4 months after consent

Screening a site of your own?

RedlineUK · £39

West Northamptonshire approves 92% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Homestead Farm (Alderton)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

West Northamptonshire’s record on solar

West Northamptonshire has decided 61 solar farms and approved 92%, taking a median of 2.9 months. See every solar farm decision in West Northamptonshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
55.6 km
Battery · Under Construction
56.2 km
Solar Photovoltaics · Operational
56.3 km
Solar Photovoltaics · Operational
56.7 km
Solar Photovoltaics · Operational
46.8 km
Solar Photovoltaics · Operational
127.3 km
Wind Onshore · Operational
7.27.8 km
Anaerobic Digestion · Under Construction
8.2 km

How big is Homestead Farm (Alderton)?

Homestead Farm (Alderton) has a recorded installed capacity of 17.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Homestead Farm (Alderton)?

REPD records the operator as CEE. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Homestead Farm (Alderton) approved and built?

The application was submitted on 11 September 2014. Permission was granted on 11 December 2014, 3 months later. The site became operational on 30 March 2015, 4 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2261.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode