Renewable sites › Shewalton Road
Shewalton Road
Shewalton Road is a 3 MW onshore wind farm under construction in North Ayrshire. Planning permission was granted on 2 May 2019, 2 months after submission. Operator of record: GlaxoSmithKline.
Planning and build timeline
| Application submitted | 14 March 2019 |
| Permission granted | 2 May 2019 2 months after submission |
| Operational | not recorded |
Screening a site of your own?
North Ayrshire approves 78% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Shewalton Road’s recorded coordinate — swap in your own postcode or coordinates.
North Ayrshire’s record on onshore wind
North Ayrshire has decided 18 onshore wind schemes and approved 78%, taking a median of 8.5 months. See every onshore wind scheme decision in North Ayrshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Anaerobic Digestion · Operational | 1 | 0.2 km |
Wind Onshore · Operational | 7.5 | 0.3 km |
Solar Photovoltaics · Under Construction | 19.9 | 0.3 km |
EfW Incineration · Under Construction | 17 | 0.5 km |
Wind Onshore · Operational | 2.5 | 1 km |
Solar Photovoltaics · Under Construction | 5 | 1.1 km |
Biomass (dedicated) · Operational | 26 | 1.8 km |
Solar Photovoltaics · Under Construction | 7.5 | 3.3 km |
How big is Shewalton Road?
Shewalton Road has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Shewalton Road?
REPD records the operator as GlaxoSmithKline. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Shewalton Road approved and built?
The application was submitted on 14 March 2019. Permission was granted on 2 May 2019, 2 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7376.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode