Shewalton Landfill Solar Farm

Shewalton Landfill Solar Farm is a 5 MW solar farm under construction in North Ayrshire. Planning permission was granted on 15 June 2023, 1 months after submission. Operator of record: North Ayrshire Council.

5 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
North Ayrshire Council
North Ayrshire
Authority
Scotland

Planning and build timeline

Application submitted10 May 2023
Permission granted15 June 2023
1 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

North Ayrshire approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Shewalton Landfill Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

North Ayrshire’s record on solar

North Ayrshire has decided 14 solar farms and approved 100%, taking a median of 1.4 months. See every solar farm decision in North Ayrshire

Other built sites within 15 km

SiteMWDistance
EfW Incineration · Under Construction
170.8 km
Wind Onshore · Operational
7.51 km
Wind Onshore · Under Construction
31.1 km
Anaerobic Digestion · Operational
11.3 km
Solar Photovoltaics · Under Construction
19.91.4 km
Wind Onshore · Operational
2.52.1 km
Biomass (dedicated) · Operational
262.1 km
Solar Photovoltaics · Under Construction
7.52.3 km

How big is Shewalton Landfill Solar Farm?

Shewalton Landfill Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Shewalton Landfill Solar Farm?

REPD records the operator as North Ayrshire Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Shewalton Landfill Solar Farm approved and built?

The application was submitted on 10 May 2023. Permission was granted on 15 June 2023, 1 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 13250.