Glaxosmithkline Shewalton Road
Glaxosmithkline Shewalton Road is under construction in North Ayrshire with a recorded capacity of 19.9 MW.
Planning and build timeline
| Application submitted | 2019-03-14 |
| Permission granted | 2019-06-19 3 months after submission |
| Operational | not recorded |
North Ayrshire’s record on solar
North Ayrshire has decided 14 solar farms and approved 100%, taking a median of 1.4 months. See every solar farm decision in North Ayrshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
GlaxoSmithKline (Waste AD) Anaerobic Digestion · Operational | 1 | 0.2 km |
Shewalton Road Wind Onshore · Under Construction | 3 | 0.3 km |
GlaxoSmithKline Wind Project Wind Onshore · Operational | 7.5 | 0.4 km |
GlaxoSmithKline Wind Project (Turbine 4) Wind Onshore · Operational | 2.5 | 0.7 km |
Oldhall Industrial Estate EfW Incineration · Under Construction | 17 | 0.8 km |
Shewalton Landfill Solar Farm Solar Photovoltaics · Under Construction | 5 | 1.4 km |
Caledonian Papermill Biomass (dedicated) · Operational | 26 | 2 km |
Nethermains - Solar Farm Solar Photovoltaics · Under Construction | 7.5 | 3.5 km |
How big is Glaxosmithkline Shewalton Road?
Glaxosmithkline Shewalton Road has a recorded installed capacity of 19.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Glaxosmithkline Shewalton Road?
REPD records the operator as Glaxosmithkline. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Glaxosmithkline Shewalton Road approved and built?
The application was submitted on 2019-03-14. Permission was granted on 2019-06-19, 3 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7232.