Renewable sitesGlaxoSmithKline (Waste AD)

GlaxoSmithKline (Waste AD)

GlaxoSmithKline (Waste AD) is operational in North Ayrshire with a recorded capacity of 1 MW, and has been generating since 2015-03-15.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-03-15
Anaerobic Digestion
Technology
GlaxoSmithKline
North Ayrshire
Authority
Scotland

Planning and build timeline

Application submitted2014-01-21
Permission granted2014-02-21
1 months after submission
Operational2015-03-15
13 months after consent

Other built sites within 15 km

SiteMWDistance
Shewalton Road
Wind Onshore · Under Construction
30.2 km
Glaxosmithkline Shewalton Road
Solar Photovoltaics · Under Construction
19.90.2 km
GlaxoSmithKline Wind Project
Wind Onshore · Operational
7.50.4 km
Oldhall Industrial Estate
EfW Incineration · Under Construction
170.7 km
GlaxoSmithKline Wind Project (Turbine 4)
Wind Onshore · Operational
2.50.8 km
Shewalton Landfill Solar Farm
Solar Photovoltaics · Under Construction
51.3 km
Caledonian Papermill
Biomass (dedicated) · Operational
261.8 km
Nethermains - Solar Farm
Solar Photovoltaics · Under Construction
7.53.5 km

How big is GlaxoSmithKline (Waste AD)?

GlaxoSmithKline (Waste AD) has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates GlaxoSmithKline (Waste AD)?

REPD records the operator as GlaxoSmithKline. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was GlaxoSmithKline (Waste AD) approved and built?

The application was submitted on 2014-01-21. Permission was granted on 2014-02-21, 1 months later. The site became operational on 2015-03-15, 13 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 343.