GlaxoSmithKline Wind Project

GlaxoSmithKline Wind Project is operational in North Ayrshire with a recorded capacity of 7.5 MW, and has been generating since 2013-06-30.

7.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-06-30
Wind Onshore
Technology
Glaxosmithkline
North Ayrshire
Authority
Scotland

Planning and build timeline

Application submitted2010-01-06
Permission granted2012-05-01
28 months after submission
Operational2013-06-30
14 months after consent

North Ayrshire’s record on onshore wind

North Ayrshire has decided 18 onshore wind schemes and approved 78%, taking a median of 8.5 months. See every onshore wind scheme decision in North Ayrshire

Other built sites within 15 km

SiteMWDistance
Shewalton Road
Wind Onshore · Under Construction
30.3 km
Glaxosmithkline Shewalton Road
Solar Photovoltaics · Under Construction
19.90.4 km
GlaxoSmithKline (Waste AD)
Anaerobic Digestion · Operational
10.4 km
Oldhall Industrial Estate
EfW Incineration · Under Construction
170.6 km
Shewalton Landfill Solar Farm
Solar Photovoltaics · Under Construction
51 km
GlaxoSmithKline Wind Project (Turbine 4)
Wind Onshore · Operational
2.51.1 km
Caledonian Papermill
Biomass (dedicated) · Operational
262.1 km
Nethermains - Solar Farm
Solar Photovoltaics · Under Construction
7.53.1 km

How big is GlaxoSmithKline Wind Project?

GlaxoSmithKline Wind Project has a recorded installed capacity of 7.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates GlaxoSmithKline Wind Project?

REPD records the operator as Glaxosmithkline. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was GlaxoSmithKline Wind Project approved and built?

The application was submitted on 2010-01-06. Permission was granted on 2012-05-01, 28 months later. The site became operational on 2013-06-30, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3841.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council