Oldhall Industrial Estate

Oldhall Industrial Estate is a 17 MW energy-from-waste plant under construction in North Ayrshire. Planning permission was granted on 13 January 2020, 6 months after submission. Operator of record: Dover Yard.

17 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
EfW Incineration
Technology
Dover Yard
North Ayrshire
Authority
Scotland

Planning and build timeline

Application submitted29 July 2019
Permission granted13 January 2020
6 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in North Ayrshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Oldhall Industrial Estate’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Under Construction
30.5 km
Wind Onshore · Operational
7.50.6 km
Anaerobic Digestion · Operational
10.7 km
Solar Photovoltaics · Under Construction
50.8 km
Solar Photovoltaics · Under Construction
19.90.8 km
Wind Onshore · Operational
2.51.4 km
Biomass (dedicated) · Operational
261.6 km
Solar Photovoltaics · Under Construction
7.53 km

How big is Oldhall Industrial Estate?

Oldhall Industrial Estate has a recorded installed capacity of 17 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Oldhall Industrial Estate?

REPD records the operator as Dover Yard. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Oldhall Industrial Estate approved and built?

The application was submitted on 29 July 2019. Permission was granted on 13 January 2020, 6 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6753.