Renewable sites › Shakespeare Farm Landfill Site
Shakespeare Farm Landfill Site
Shakespeare Farm Landfill Site is operational in Medway with a recorded capacity of 1 MW, and has been generating since 2000-08-02.
Planning and build timeline
| Application submitted | 1999-05-10 |
| Permission granted | 1999-11-01 6 months after submission |
| Operational | 2000-08-02 9 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 1 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
MALMAYNES HALL FARM Solar Photovoltaics · Operational | 12 | 1 km |
Port of Sheerness Wind Farm (was Lappel Bank) Wind Onshore · Operational | 8.2 | 9.8 km |
Tesco Super-Store (Bridge Road) Solar Photovoltaics · Operational | 0.4 | 10.6 km |
Pitsea Landfill Scheme Landfill Gas · Operational | 11.6 | 10.8 km |
Pitsea Tipp Landfill Gas · Operational | 14 | 10.8 km |
Iwade Solar Farm Solar Photovoltaics · Operational | 1.7 | 11.2 km |
Orchard Farm Solar Photovoltaics · Operational | 10 | 12.1 km |
Land off Queenborough Road Battery · Under Construction | 40 | 12.5 km |
How big is Shakespeare Farm Landfill Site?
Shakespeare Farm Landfill Site has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Shakespeare Farm Landfill Site?
REPD records the operator as Biffa. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Shakespeare Farm Landfill Site approved and built?
The application was submitted on 1999-05-10. Permission was granted on 1999-11-01, 6 months later. The site became operational on 2000-08-02, 9 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 721.