Shakespeare Farm Landfill Site

Shakespeare Farm Landfill Site is an operational 1 MW landfill gas site in Medway, generating since 2 August 2000. Planning permission was granted on 1 November 1999, 6 months after submission. Operator of record: Biffa.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2 August 2000
Landfill Gas
Technology
Biffa
Medway
Authority
England

Planning and build timeline

Application submitted10 May 1999
Permission granted1 November 1999
6 months after submission
Operational2 August 2000
9 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Medway: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Shakespeare Farm Landfill Site’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 1 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
121 km
Wind Onshore · Operational
8.29.8 km
Solar Photovoltaics · Operational
0.410.6 km
Landfill Gas · Operational
11.610.8 km
Landfill Gas · Operational
1410.8 km
Solar Photovoltaics · Operational
1.711.2 km
Solar Photovoltaics · Operational
1012.1 km
Battery · Under Construction
4012.5 km

How big is Shakespeare Farm Landfill Site?

Shakespeare Farm Landfill Site has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Shakespeare Farm Landfill Site?

REPD records the operator as Biffa. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Shakespeare Farm Landfill Site approved and built?

The application was submitted on 10 May 1999. Permission was granted on 1 November 1999, 6 months later. The site became operational on 2 August 2000, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 721.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode