Renewable sitesShakespeare Farm Landfill Site

Shakespeare Farm Landfill Site

Shakespeare Farm Landfill Site is operational in Medway with a recorded capacity of 1 MW, and has been generating since 2000-08-02.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2000-08-02
Landfill Gas
Technology
Biffa
Medway
Authority
England

Planning and build timeline

Application submitted1999-05-10
Permission granted1999-11-01
6 months after submission
Operational2000-08-02
9 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 1 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
MALMAYNES HALL FARM
Solar Photovoltaics · Operational
121 km
Port of Sheerness Wind Farm (was Lappel Bank)
Wind Onshore · Operational
8.29.8 km
Tesco Super-Store (Bridge Road)
Solar Photovoltaics · Operational
0.410.6 km
Pitsea Landfill Scheme
Landfill Gas · Operational
11.610.8 km
Pitsea Tipp
Landfill Gas · Operational
1410.8 km
Iwade Solar Farm
Solar Photovoltaics · Operational
1.711.2 km
Orchard Farm
Solar Photovoltaics · Operational
1012.1 km
Land off Queenborough Road
Battery · Under Construction
4012.5 km

How big is Shakespeare Farm Landfill Site?

Shakespeare Farm Landfill Site has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Shakespeare Farm Landfill Site?

REPD records the operator as Biffa. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Shakespeare Farm Landfill Site approved and built?

The application was submitted on 1999-05-10. Permission was granted on 1999-11-01, 6 months later. The site became operational on 2000-08-02, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 721.