Renewable sites › Land off Queenborough Road
Land off Queenborough Road
Land off Queenborough Road is a 40 MW battery storage site under construction in Swale. Planning permission was granted on 12 October 2017, 4 months after submission. Operator of record: UK Power Reserve.
Planning and build timeline
| Application submitted | 8 June 2017 |
| Permission granted | 12 October 2017 4 months after submission |
| Operational | not recorded |
Screening a site of your own?
Swale approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Land off Queenborough Road’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Swale’s record on battery storage
Swale has decided 6 battery storage schemes and approved 100%, taking a median of 6.1 months. See every battery storage scheme decision in Swale →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 11 | 2.8 km |
Biomass (dedicated) · Operational | 25 | 3 km |
Solar Photovoltaics · Operational | 0.4 | 3.8 km |
Wind Onshore · Operational | 8.2 | 4.1 km |
Solar Photovoltaics · Operational | 2 | 4.4 km |
EfW Incineration · Operational | 49.9 | 4.7 km |
Battery · Operational | 49.9 | 5 km |
Wind Onshore · Operational | 4.6 | 6 km |
How big is Land off Queenborough Road?
Land off Queenborough Road has a recorded installed capacity of 40 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Land off Queenborough Road?
REPD records the operator as UK Power Reserve. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Land off Queenborough Road approved and built?
The application was submitted on 8 June 2017. Permission was granted on 12 October 2017, 4 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7003.