Land off Queenborough Road

Land off Queenborough Road is under construction in Swale with a recorded capacity of 40 MW.

40 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
UK Power Reserve
Swale
Authority
England

Planning and build timeline

Application submitted2017-06-08
Permission granted2017-10-12
4 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Swale’s record on battery storage

Swale has decided 6 battery storage schemes and approved 100%, taking a median of 6.1 months. See every battery storage scheme decision in Swale

Other built sites within 15 km

SiteMWDistance
South Lees Farm
Solar Photovoltaics · Operational
112.8 km
Ridham CHP Plant
Biomass (dedicated) · Operational
253 km
Tesco Super-Store (Bridge Road)
Solar Photovoltaics · Operational
0.43.8 km
Port of Sheerness Wind Farm (was Lappel Bank)
Wind Onshore · Operational
8.24.1 km
Morrisons roof mounted solar
Solar Photovoltaics · Operational
24.4 km
K3 CHP Facility (Kemsley EfW)
EfW Incineration · Operational
49.94.7 km
Kemsley Substation
Battery · Operational
49.95 km
HMP Standford Hill
Wind Onshore · Operational
4.66 km

How big is Land off Queenborough Road?

Land off Queenborough Road has a recorded installed capacity of 40 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land off Queenborough Road?

REPD records the operator as UK Power Reserve. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land off Queenborough Road approved and built?

The application was submitted on 2017-06-08. Permission was granted on 2017-10-12, 4 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7003.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council