Land off Queenborough Road is under construction in Swale with a recorded capacity of 40 MW.
Planning and build timeline
| Application submitted | 2017-06-08 |
| Permission granted | 2017-10-12 4 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Swale’s record on battery storage
Swale has decided 6 battery storage schemes and approved 100%, taking a median of 6.1 months. See every battery storage scheme decision in Swale →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
South Lees Farm Solar Photovoltaics · Operational | 11 | 2.8 km |
Ridham CHP Plant Biomass (dedicated) · Operational | 25 | 3 km |
Tesco Super-Store (Bridge Road) Solar Photovoltaics · Operational | 0.4 | 3.8 km |
Port of Sheerness Wind Farm (was Lappel Bank) Wind Onshore · Operational | 8.2 | 4.1 km |
Morrisons roof mounted solar Solar Photovoltaics · Operational | 2 | 4.4 km |
K3 CHP Facility (Kemsley EfW) EfW Incineration · Operational | 49.9 | 4.7 km |
Kemsley Substation Battery · Operational | 49.9 | 5 km |
HMP Standford Hill Wind Onshore · Operational | 4.6 | 6 km |
How big is Land off Queenborough Road?
Land off Queenborough Road has a recorded installed capacity of 40 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Land off Queenborough Road?
REPD records the operator as UK Power Reserve. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Land off Queenborough Road approved and built?
The application was submitted on 2017-06-08. Permission was granted on 2017-10-12, 4 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7003.