Novarly ParcelRenewable sites

Renewable sitesOrchard Farm

Orchard Farm

Orchard Farm is operational in Swale with a recorded capacity of 10 MW, and has been generating since 2016-02-02.

10 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-02-02
Solar Photovoltaics
Technology
Omega Solar / OPDE
Swale
Authority
England

Planning and build timeline

Application submitted2014-08-07
Permission granted2014-10-22
2 months after submission
Operational2016-02-02
15 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 1 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Swale’s record on solar

Swale has decided 26 solar farms and approved 96%, taking a median of 2.5 months. See every solar farm decision in Swale

Other built sites within 15 km

SiteMWDistance
Bobbing solar farm
Solar Photovoltaics · Operational
11.31.5 km
Kemsley Substation
Battery · Operational
49.93.1 km
Iwade Solar Farm
Solar Photovoltaics · Operational
1.73.1 km
Morrisons roof mounted solar
Solar Photovoltaics · Operational
23.2 km
K3 CHP Facility (Kemsley EfW)
EfW Incineration · Operational
49.94.2 km
Ridham CHP Plant
Biomass (dedicated) · Operational
254.4 km
Plot 2B EurolinkV
Battery · Under Construction
205.6 km
Tonge Corner Farm
Solar Photovoltaics · Operational
225.9 km

How big is Orchard Farm?

Orchard Farm has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Orchard Farm?

REPD records the operator as Omega Solar / OPDE. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Orchard Farm approved and built?

The application was submitted on 2014-08-07. Permission was granted on 2014-10-22, 2 months later. The site became operational on 2016-02-02, 15 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4846.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council