MALMAYNES HALL FARM
MALMAYNES HALL FARM is an operational 12 MW solar farm in Medway, generating since 31 March 2015. Planning permission was granted on 6 November 2014, 3 months after submission. Operator of record: Wessex Solar Energy.
Planning and build timeline
| Application submitted | 31 July 2014 |
| Permission granted | 6 November 2014 3 months after submission |
| Operational | 31 March 2015 5 months after consent |
Screening a site of your own?
Medway approves 90% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with MALMAYNES HALL FARM’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 1 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Medway’s record on solar
Medway has decided 10 solar farms and approved 90%, taking a median of 2.4 months. See every solar farm decision in Medway →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Landfill Gas · Operational | 1 | 1 km |
Wind Onshore · Operational | 8.2 | 9.4 km |
Solar Photovoltaics · Operational | 1.7 | 10.2 km |
Solar Photovoltaics · Operational | 0.4 | 10.2 km |
Solar Photovoltaics · Operational | 10 | 11.2 km |
Landfill Gas · Operational | 11.6 | 11.6 km |
Landfill Gas · Operational | 14 | 11.7 km |
Battery · Under Construction | 40 | 11.9 km |
How big is MALMAYNES HALL FARM?
MALMAYNES HALL FARM has a recorded installed capacity of 12 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates MALMAYNES HALL FARM?
REPD records the operator as Wessex Solar Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was MALMAYNES HALL FARM approved and built?
The application was submitted on 31 July 2014. Permission was granted on 6 November 2014, 3 months later. The site became operational on 31 March 2015, 5 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2135.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode