Port of Sheerness Wind Farm (was Lappel Bank)
Port of Sheerness Wind Farm (was Lappel Bank) is operational in Swale with a recorded capacity of 8.2 MW, and has been generating since 2016-09-20.
Planning and build timeline
| Application submitted | 2008-08-26 |
| Permission granted | 2009-03-11 6 months after submission |
| Operational | 2016-09-20 90 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
- Conservation area — Sheerness : Royal Naval Dockyard and Bluetown
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Tesco Super-Store (Bridge Road) Solar Photovoltaics · Operational | 0.4 | 0.8 km |
Land off Queenborough Road Battery · Under Construction | 40 | 4.1 km |
South Lees Farm Solar Photovoltaics · Operational | 11 | 6.1 km |
Ridham CHP Plant Biomass (dedicated) · Operational | 25 | 6.8 km |
Morrisons roof mounted solar Solar Photovoltaics · Operational | 2 | 7.9 km |
Kemsley Substation Battery · Operational | 49.9 | 8.5 km |
K3 CHP Facility (Kemsley EfW) EfW Incineration · Operational | 49.9 | 8.5 km |
Orchard Farm Solar Photovoltaics · Operational | 10 | 8.8 km |
How big is Port of Sheerness Wind Farm (was Lappel Bank)?
Port of Sheerness Wind Farm (was Lappel Bank) has a recorded installed capacity of 8.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Port of Sheerness Wind Farm (was Lappel Bank)?
REPD records the operator as Peel Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Port of Sheerness Wind Farm (was Lappel Bank) approved and built?
The application was submitted on 2008-08-26. Permission was granted on 2009-03-11, 6 months later. The site became operational on 2016-09-20, 90 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3738.